Bathroom Renovation – November-December 2016

BEFORE

Click Images To View BEFORE

[ngg_images source=”galleries” container_ids=”14″ display_type=”photocrati-nextgen_basic_thumbnails” override_thumbnail_settings=”0″ thumbnail_width=”240″ thumbnail_height=”160″ thumbnail_crop=”1″ images_per_page=”20″ number_of_columns=”0″ ajax_pagination=”0″ show_all_in_lightbox=”0″ use_imagebrowser_effect=”0″ show_slideshow_link=”0″ slideshow_link_text=”[Show slideshow]” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″] 

AFTER

Click Images To View AFTER

[ngg_images source=”galleries” container_ids=”15″ display_type=”photocrati-nextgen_basic_thumbnails” override_thumbnail_settings=”0″ thumbnail_width=”240″ thumbnail_height=”160″ thumbnail_crop=”1″ images_per_page=”20″ number_of_columns=”0″ ajax_pagination=”0″ show_all_in_lightbox=”0″ use_imagebrowser_effect=”0″ show_slideshow_link=”0″ slideshow_link_text=”[Show slideshow]” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″] 

 Bathroom Renovation – October 2016

BEFORE

Click Images To View BEFORE

[ngg_images source=”galleries” container_ids=”12″ display_type=”photocrati-nextgen_basic_thumbnails” override_thumbnail_settings=”0″ thumbnail_width=”240″ thumbnail_height=”160″ thumbnail_crop=”1″ images_per_page=”20″ number_of_columns=”0″ ajax_pagination=”0″ show_all_in_lightbox=”0″ use_imagebrowser_effect=”0″ show_slideshow_link=”0″ slideshow_link_text=”[Show slideshow]” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″] 

AFTER

Click Images To View AFTER

[ngg_images source=”galleries” container_ids=”13″ display_type=”photocrati-nextgen_basic_thumbnails” override_thumbnail_settings=”0″ thumbnail_width=”240″ thumbnail_height=”160″ thumbnail_crop=”1″ images_per_page=”20″ number_of_columns=”0″ ajax_pagination=”0″ show_all_in_lightbox=”0″ use_imagebrowser_effect=”0″ show_slideshow_link=”0″ slideshow_link_text=”[Show slideshow]” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″] 

Bathroom Renovation – August-September 2016

BEFORE

Click Images To View BEFORE

[ngg_images source=”galleries” container_ids=”10″ display_type=”photocrati-nextgen_basic_thumbnails” override_thumbnail_settings=”0″ thumbnail_width=”240″ thumbnail_height=”160″ thumbnail_crop=”1″ images_per_page=”20″ number_of_columns=”0″ ajax_pagination=”0″ show_all_in_lightbox=”0″ use_imagebrowser_effect=”0″ show_slideshow_link=”0″ slideshow_link_text=”[Show slideshow]” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″]AFTER

Click Images To View AFTER

[ngg_images source=”galleries” container_ids=”11″ display_type=”photocrati-nextgen_basic_thumbnails” override_thumbnail_settings=”0″ thumbnail_width=”240″ thumbnail_height=”160″ thumbnail_crop=”1″ images_per_page=”20″ number_of_columns=”0″ ajax_pagination=”0″ show_all_in_lightbox=”0″ use_imagebrowser_effect=”0″ show_slideshow_link=”0″ slideshow_link_text=”[Show slideshow]” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″] 

 

Bathroom Renovation – July 2016

  • Bath Removed in favour of shower. Vanity basin & toilet installed.
  • 2 wall hung units for extra storage.
  • Mirror with light.
  • Duel towel rail installed (Electric & Water).
  • 3 way shower valve, fixed head and hand held head.
  • Ceiling cladding with energy efficient L.E.D. light bulbs.
  • Recessed basin sitting on black granite, also used as top for toilet vanity and window sill.

Click Images To View

[ngg_images source=”galleries” container_ids=”3″ display_type=”photocrati-nextgen_basic_thumbnails” override_thumbnail_settings=”0″ thumbnail_width=”240″ thumbnail_height=”160″ thumbnail_crop=”1″ images_per_page=”20″ number_of_columns=”0″ ajax_pagination=”0″ show_all_in_lightbox=”0″ use_imagebrowser_effect=”0″ show_slideshow_link=”0″ slideshow_link_text=”[Show slideshow]” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″]

 

Complete Bathroom Refurbishment – June 2016

  • Old suite removed. (Pictured below in Blue)
  • Wall panels removed and stripped back to existing walls
  • Ceiling lowered to standard height of 2.4m and insulated.

First Fix and preparation of walls and floor. 

  • All walls dot & dabbed, making room better insulated and easier to tile.
  • First fix of hot, cold, wastes and heating pipes.
  • Bath and shower base installed ready for tilling.
  • White ceiling cladding installed with chrome strips.
  • New fire rated down-lights installed with energy efficient LED bulbs.
  • Tiling is now complete with a wood effect tile on the floor.
  • White tiles to the walls with a featured Mosaic at the centre of bath and walk in shower.

Second fix of sanitaryware:

  • A vanity toilet cupboard installed for the extra storage.
  • Wall hung basin with 2 drawers.
  • Door made for boiler cupboard to match the furniture colour scheme.
  • Two towel rails installed, a 500mm x 1700mm and a 500mm x 1000mm.
  • Mirror installed above basin with an on/off motion sensor.

Walk in shower with 10mm glass installed.

Final job:

  • Test all taps, shower, mirror light and towel rails.
    Clean down and leave for customer to enjoy.

Click On Images To View

[ngg_images source=”galleries” container_ids=”1″ display_type=”photocrati-nextgen_basic_thumbnails” override_thumbnail_settings=”0″ thumbnail_width=”240″ thumbnail_height=”160″ thumbnail_crop=”1″ images_per_page=”20″ number_of_columns=”0″ ajax_pagination=”0″ show_all_in_lightbox=”0″ use_imagebrowser_effect=”0″ show_slideshow_link=”0″ slideshow_link_text=”[Show slideshow]” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″]