January – June 2017

Bathroom Renovation – June 2017

BEFORE

 

AFTER

En Suite New Install & Bathroom Renovation – May 2017

EN-SUITE NEW INSTALL

  • Double basins
  • 1400 x 800 shower tray – full enclosure
  • Fixed rain head, with optional hand held rinse.
  • Cabinet LED mirrors
  • Chrome Towel Rail.

Click Images To View New Install

 

BATHROOM RENOVATION

BEFORE

Click Images To View Before

 

AFTER

Click Images To View After

 

 

Bathroom Renovation – February 2017

Property with bath installed was getting difficult to use.

BEFORE

From the ‘Before’ pictures you can see the suite is quite dated.

Click Images To View Before

AFTER

Work started on removing all the existing bath suite.

  • All existing pipework removed.
  • Walls were chased so pipework could be buried out of sight.
  • New waste pipe installed to feed new appliances.
  • Square Shower Bar valve with fixed head and hand held rinse.
  • 600mm wide vanity basin with drawer pack.
  • Chrome quadrant shower enclosure.
  • 500 x 1600 chrome towel rail installed

Click Images To View After